Our sewer department will be cleaning the main lines of the sanitary sewer during the months of October & November in the Grimesville Area sewer shed on the following streets: Alexander Ave, Brooks Ave, Casey Dr, Grimesville Rd, Helminiak Ave, Helminiak St, Hillview Ave, Keyser Cir, Kurtz Rd, Linwood Ave (2330 and higher), Marvin Cir, Paige Ln, Princeton Ave (1759 and lower), Princeton Ave Ext (12 and lower), Roosevelt Ave (2302 and higher), Roseville Rd, Round Hill Rd, Spring Run Rd, Tabbs Dr, Tiffany Dr, Valley View Ave, Weller Dr, Wheatland Ave (2340 and higher).
If your property is connected to the sanitary collection system please keep your toilet lids closed and a towel draped over the toilet when not in use due to the potential of flushing and /or back flushing (water discharging from toilets) that may occur when this work is being done.